2024 BMW M3 COMPETITION

$94,995

Check out this 2024 BMW M3 Competition X-DRIVE ISLE OF MAN GREEN METALLIC/M CARBON BUCKET SEATS, Equipped with Heated Steering wheel, Heated Front Seats, M Shadowline Lights, Harmon Kardon Sound System, Executive Packag Get it while its HOT!!!!!! Freshly Serviced, PA Inspected, Detailed and Ready to Go! Our pricing is competitive and inventory sells quickly. For more pictures of this vehicle check out our website at www.warwickautopark.com! We take trade-ins, have low financing rates and extended warranties available. BE CAREFUL. THERE ARE DEALERS THAT ARE HIDING A $2000 TRADE OR DOWN PAYMENT EQUIVALENT IN THEIR PRICING. DON'T BE FOOLED. IT GETS ADDED TO THE ONLINE PRICING.. Our ONLINE PRICING MISSION at Warwick Autopark is to present value pricing to all of our customers. Stop in today and see the Warwick Autopark difference!
  • AM/FM Stereo
  • Active Belts
  • Air Conditioning
  • Air bag
  • All Wheel Drive
  • Aluminum Wheels
  • Android Auto
  • Anti-lock Brakes
  • Apple CarPlay
  • Automatic High Beams
  • Back up Camera
  • Backup Camera
  • Backup Sensors
  • Blind Spot Warning (BSW)
  • Blind-Spot Monitoring
  • Bluetooth
  • Bluetooth Connectivity
  • Cruise Control
  • Daytime Running Light (DRL)
  • Daytime Running Lights
  • Dual Power Seats
  • Dual Rear Side Air Bags
  • Dual-Zone Automatic Climate
  • Dynamic Brake Support (DBS)
  • Electronic Stability Control (ESC)
  • Forward Collision Warning (FCW)
  • Heated Seats
  • Heated Steering wheel
  • Immobilizer / keyless entry / and alarm
  • Keyless Ignition
  • Lane Departure Warning (LDW)
  • Leather
  • Navigation System
  • Park Sensor
  • Parking Assist
  • Pedestrian Automatic Emergency Braking (PAEB)
  • Power Brakes
  • Power Locks
  • Power Rear Hatch
  • Power Seat
  • Power Steering
  • Power Windows
  • Premium Sound
  • Rear Automatic Emergency Braking
  • Rear Cross-Traffic Alert
  • Rear Defroster
  • Rear Head Air Bags
  • Rear Spoiler
  • Rear Wiper
  • Rearview Camera
  • Remote Trunk
  • Satellite Radio
  • Semiautomatic Headlamp Beam Switching
  • Signal Mirrors
  • Telescoping Wheel
  • Tilt Steering Wheel
  • Tinted Glass
  • Traction Control
  • Trip/Mileage Computer
  • Turbo
  • Turbocharger
  • USB Port
  • Voice Controls
  • Xenon Headlights

$94,995

Mileage:
8,815 Miles
Type:
Car
Body style:
sedan
Exterior:
isle of man green metalli
Interior:
silverstone/ black
Engine:
Gas 3.0L 6 cylinder
Transmission:
8 speed automatic
Drive Type:
All Wheel Drive
Stock:
B31358
VIN:
WBS43AY04RFS31358

Check Availability